At-a-glance comparison
| Specification |
SBAL-V (fully auto) |
SBAL-III (semi-auto) |
| Automation level | Fully automatic, single-operator | Hydraulic semi-automatic |
| Operators required | 1 | 2 |
| Line speed | 18 m/min | 18 m/min |
| Line layout | U-shape, continuous flow | Inline with separate TDF station |
| Coil width | Up to 1550 mm | Up to 1550 mm |
| Material thickness | 0.5–1.5 mm | 0.5–2.0 mm |
| Material compatibility | Galvanized, stainless 304/316, aluminium, aluminised | Galvanized, stainless 304/316, aluminium, aluminised |
| TDF flange forming | Integrated inline | Separate station or standalone SBTDF |
| Pittsburgh lock forming | Integrated inline | Separate SBLC lockformer |
| Length tolerance | ±1.0 mm | ±1.5 mm |
| Width tolerance | ±0.5 mm | ±1.0 mm |
| PLC control | Siemens / Delta with touchscreen | Basic PLC, manual sequencing |
| Installed power | 40 kW | 10.7 kW |
| Floor footprint | ~30 × 8 m | ~20 × 6 m + separate TDF area |
| Relative capital cost | 1.0x (reference) | ~0.4-0.5x |
When SBAL-V wins
- High throughput rectangular duct programmes including stainless work
- High labor cost per hour (labor savings drive ROI)
- Tight length and width tolerance requirement — Seal Class A projects
- Single-point accountability preference — one line, one operator, one PLC
- Mixed-spec production where the PLC needs to drive size changes without re-setup
When SBAL-III still wins
- Throughput modest enough that full SBAL-V automation is underused
- Lower capital budget or first-time investment
- Abundant, lower-cost skilled labor
- Workshops that already own a separate TDF station and want to integrate it
- Projects where the hydraulic notching is preferred
- Galvanized-only duct programmes (no stainless requirement)
Throughput per operator — the real decision metric
Beyond catalogue line speed, the practical metric is square meters of finished duct per operator-hour. Project-specific output depends on duct size mix, downstream balancing and changeover frequency. As a rough working figure for sizing exercises:
- SBAL-V: 18 m/min line speed × single-operator U-shape continuous flow → highest m²/operator-hour
- SBAL-III: 18 m/min line speed × two-operator inline + separate TDF → roughly 1/3 the SBAL-V m²/operator-hour
The SBAL-V delivers roughly 3x the productivity per labor hour. Whether that justifies the capital premium depends on your local labor cost.
Integration with spiral tubeformers
Both lines integrate cleanly with an SBTF-1602 spiral tubeformer for fabricators that do both round and rectangular duct. SBAL-V is typically placed on a parallel bay with shared coil storage; SBAL-III can share coil storage and an overhead crane with the spiral line. See our HVAC duct factory layout guide for full layout planning.
A 30-second decision framework
- What is your target daily output? Under 800 m² → SBAL-III. Over 1,000 m² → SBAL-V.
- What is your labor cost per hour? Under $5 → SBAL-III often still pays. Over $15 → SBAL-V always wins.
- Do you need Seal Class A routinely? Yes → SBAL-V's tighter tolerances matter.
- Is capital or labor your scarce resource? Capital → SBAL-III. Labor → SBAL-V.
Get a shift-by-shift ROI model for your workshop →
Material handling and footprint differences
The other thing that distinguishes the two lines on the workshop floor is the material‑handling pattern. The SBAL‑V is a U‑shape line that finishes the duct on a single bay — coil goes in at one end, finished duct comes out four metres away from the same end. This shortens the crane travel and lets a single forklift operator keep both the upstream coil store and the downstream finished‑duct store in line of sight. The SBAL‑III is a more traditional inline layout: coil enters at one end, finished duct exits roughly twenty metres downstream, and the separate TDF flange station is set up as a side cell. For a workshop with limited floor area, the U‑shape SBAL‑V is often the only option that fits without extending the building. For a workshop with a long bay and existing TDF tooling, the SBAL‑III is the cheaper drop‑in.
Total cost of ownership over five years
Capital cost is only part of the picture. The honest comparison runs over five years and includes labour, consumables, maintenance, and downtime. In a high-wage market with a high daily output target, the labour saving (one operator vs three) can outweigh the higher upfront price of an SBAL‑V over five years. In a low-wage market, the SBAL‑III plus separate TDF station can win on total cost unless the daily output target is high. Taokron engineers can build a project‑specific TCO model from the four numbers you already know: daily target, labour cost, electricity cost, and shift count. Ask for it in your first enquiry and we will run it before quoting.
Starting on SBAL-III, adding SBAL-V later
The SBAL‑V is a different architecture rather than an upgrade of the SBAL‑III, so the choice is best made against your throughput target up front. If output volume, labour cost, or quality requirements grow later, a shop can add an SBAL‑V alongside the SBAL‑III, and both lines take the same 1250 or 1550 mm coil widths.
FAQ
What is the main difference between SBAL-V and SBAL-III?
SBAL-V is fully automatic, single-operator, U-shape flow with integrated TDF and Pittsburgh lock. SBAL-III is hydraulic semi-automatic with separate TDF and lockformer stations and typically two operators.
Which line runs faster?
SBAL-V: 18 m/min line speed, 40 kW total drive, single-operator U-shape continuous flow. SBAL-III: 18 m/min line speed, 10.7 kW total drive, two-operator inline with separate TDF station. SBAL-V wins on m²/operator-hour by roughly 3× because of the U-shape architecture, not raw line speed.
Which line costs less?
SBAL-III is roughly 40-50% of the SBAL-V capital cost. For lower-throughput, lower-labor-cost workshops, SBAL-III can pay back faster. For high-throughput, stainless-capable, high-labor-cost workshops, SBAL-V pays back faster despite the higher upfront price.
Can both lines handle stainless steel?
Yes. Both handle galvanized, stainless 304/316, aluminium and aluminised steel — the SBAL-V up to 1.5 mm and the SBAL-III up to 2.0 mm thickness. Stainless runs slightly slower on both due to harder tooling requirements.
How much floor space does each line need?
The SBAL-V is a U-shape line about 14.5 m long that finishes duct back at the feed end, so it fits a single bay. The SBAL-III is a longer inline layout, roughly 20 m end to end, plus a separate TDF flange station as a side cell. For a tight footprint the U-shape SBAL-V is often the only fit.
Can an SBAL-III be upgraded to an SBAL-V later?
No. They are different architectures: the SBAL-V is a single-operator U-shape continuous line with integrated TDF and Pittsburgh forming, while the SBAL-III is semi-automatic inline with a separate TDF station. Choose the line that matches your throughput target up front rather than planning to convert.